Purari River Wabo power project feasibility report: volume 1: summary.

Holding Library Call Number
L016552
Notes
ANBD No.: 2513056 - v. 1. Summary -- v. 2. Hydroelectric project -- v. 3. Port, industrial, and urban development -- v. 4. Access road -- v. 5. Geology and construction materials for hydroelectric plant -- v. 6. Hydrologic investigations for hydroelectric project -- v. 7. Field data for port, industrial, and urban development -- v. 8. Drill logs for hydroelectric project.

Contents

PURARI RIVER WABO POWER PROJECT FEASIBILITY REPORT 1
PURARI RIVER WABO POWER PROJECT FEASIBILITY REPORT 3 , 4 , 5 , 6
PREFACE 7 , 8
CONTENTS 9 , 10
LIST OF TABLES 11
LIST OF FIGURES 12
LIST OF APPENDIXES 12
PRINCIPAL CONCLUSIONS 13
1. HYDROELECTRIC PROJECT 13 , 14
2. PORT, INDUSTRIAL AND URBAN DEVELOPMENT 15 , 16
3. COMPARISON OF ALTERNATIVES FOR FULL DEVELOPMENT 16 , 17
4. IMPLEMENTATION 17 , 18
5. AURE SCHEME AS AN INITIAL DEVELOPMENT 18
1. INTRODUCTION 1.1 HISTORY OF INVESTIGATION 19 , 20 , 21
1.2 SCOPE OF THE STUDY 21 , 22 , 23
1.3 FIELD AND OFFICE INVESTIGATIONS 24 , 25
1.4 BASIC DATA 25
1.5 GLOSSARY 25
2. HYDROELECTRIC DEVELOPMENT 2.1 GENERAL 26
2.2 THE PURARI BASIN 26 , 27 , 28 , 29 , 30 , 31
2.3 GEOLOGY 31 , 32 , 33 , 34 , 35 , 36 , 37
2.4 CONSTRUCTION MATERIALS 37 , 38 , 39 , 40 , 41
2.5 OPTIMUM DEVELOPMENT OF HYDROELECTRIC PROJECT 41 , 42 , 43 , 44 , 45 , 46 , 47 , 48 , 49 , 50 , 51 , 52 , 53 , 54 , 55 , 56
2.6 STAGE DEVELOPMENT 56 , 57 , 58
2.7 MAJOR FEATURES OF HYDROELECTRIC PROJECT 58 , 59 , 60 , 61 , 62 , 63
2.8 HYDROELECTRIC PROJECT COST ESTIMATES 63 , 64
3. PORT, INDUSTRIAL AND URBAN DEVELOPMENT 65
3.2 PRINCIPAL FEATURES OF THE GULF AND HALL SOUND 65 , 66 , 67 , 68
3.3 THE NATURE OF THE DEVELOPMENT 68 , 69 , 70 , 71 , 72 , 73 , 74 , 75 , 76
3.4 ALTERNATIVE DEVELOPMENTS IN THE GULF 76 , 77 , 78
3.5 DEVELOPMENT AT HALL SOUND 78
3.6 VAILALA AND HALL SOUND COMPARED 78 , 79 , 80 , 81 , 82 , 83 , 84 , 85
3.7 STAGED DEVELOPMENT – ALUMINIUM ONLY INITIALLY 85 , 86
3.8 RESTRICTED ALUMINIUM DEVELOPMENT 86 , 87
4. FINANCIAL AND ECONOMIC ASPECTS 4.1 GENERAL 88
4.2 HYDROELECTRIC FINANCIAL ASPECTS 88 , 89 , 90 , 91
4.3 HYDROELECTRIC ECONOMICS 91 , 92 , 93
4.4 PORT AND INDUSTRIAL COST RECOVERY 93 , 94 , 95
4.5 RELATIVE COST OF SERVICES TO INDUSTRY 95 , 96 , 97 , 98
5. ENVIRONMENTAL ASPECTS 5.1 GENERAL 99
5.2 FISHERIES 99 , 100
5.3 TERRESTRIAL AND AQUATIC BIOTA 100
5.4 DELTA ECOLOGY AND SEDIMENTATION 100
5.5 WATER QUALITY AND INDUSTRIAL POLLUTION 100 , 101
5.6 WATERSHED MANAGEMENT 101
5.7 HUMAN SETTLEMENTS AND RELATED ISSUES 101
6. PROJECT IMPLEMENTATION 6.1 NATURE OF THE ORGANISATIONAL TASKS 102 , 103
6.2 BASIC STRUCTURE OF THE ORGANISATION 103 , 104 , 105 , 106 , 107 , 108 , 109 , 110
6.3 INVESTIGATION AND DESIGN STAGE 110 , 111
6.4 CONSTRUCTION CONTRACTS AND PROGRAM 111 , 112 , 113
7. ACKNOWLEDGMENTS 7.1 PAPUA NEW GUINEA GOVERNMENT 114
7.2 JOINT TECHNICAL BOARD MEMBERS 114
7.3 ADVISERS AND OBSERVERS 114
7.4 CONSULTANTS TEAM 115
7.5 PAPUA NEW GUINEA COUNTERPARTS 116 , 117 , 118 , 119
7.6 OTHER CONTRIBUTORS 119
8. CONTENTS OF OTHER VOLUMES 120 , 121 , 122
APPENDIX 'A' BRIEF CHRONOLOGY OF WABO POWER PROJECT FEASIBILITY STUDY APPENDIX A CHRONOLOGY 123 , 124 , 125
APPENDIX B INVESTIGATION SAMPLES AND RECORDS HELD IN PAPUA NEW GUINEA GOVERNMENT ARCHIVES 1. INVESTIGATION SAMPLES 126 , 127
2. RECORDS 128 , 129 , 130 , 131 , 132 , 133 , 134 , 135 , 136 , 137
3. REPORT ORIGINALS 138
APPENDIX C GLOSSARY OF TERMS AND ABBREVIATIONS 139
1. GLOSSARY OF TERMS 140 , 141 , 142 , 143 , 144 , 145 , 146 , 147 , 148 , 149 , 150
2. ABBREVIATIONS 150 , 151
3. UNITS DF MEASUREMENT 151 , 152 , 155
ERRATA 156

Text

Cite

Citation options:
Work identifier

http://nla.gov.au/nla.obj-4189370712

Download

Select the images you want to download, or the whole document.

Available formats
TIF high resolution
Include
All
Current

Or select a range of images:

Order

You can order a copy of this work from Copies Direct.

Copies Direct supplies reproductions of collection material for a fee. This service is offered by the National Library of Australia

Include

Or select a range of images:

Share

Share on Twitter

Share on Facebook

What can I do with this?

Unknown

Copyright status could not be determined due to data in the record being incomplete or inaccurate.

For more information please see: how copyright status is determined.