|
No title
|
1
|
|
No title
|
3
,
4
,
5
|
|
CONTENTS
|
7
,
8
,
9
,
10
|
|
LIST OF TABLES
|
11
,
12
|
|
LIST OF FIGURES
|
13
,
14
|
|
LIST OF APPENDIXES
|
14
|
|
1. INTRODUCTION 1.1 HISTORY OF INVESTIGATIONS
|
15
|
|
1.2 SCOPE OF REPORT
|
16
|
|
1.3 FIELD INVESTIGATIONS
|
16
,
17
|
|
1.4 GLOSSARY
|
17
|
|
2. PROJECT REQUIREMENTS AND MAJOR FEATURES 2.1 PROJECT REQUIREMENTS
|
19
|
|
2.2 WABO DAM AND ASSOCIATED WORKS
|
19
,
20
,
21
,
22
|
|
2.3 POWER TRANSMISSION
|
22
|
|
2.4 AUXILIARY POWER SOURCES
|
22
,
23
|
|
3. HYDROLOGIC INVESTIGATIONS 3.1 GENERAL
|
25
|
|
3.2 THE CATCHMENT
|
25
|
|
3.3 DATA AVAILABLE
|
25
,
26
|
|
3.4 ADDITIONAL DATA COLLECTED
|
26
|
|
3.5 RUNOFF ESTIMATION
|
27
|
|
3.6 GENERATED 500-YEAR SEQUENCE OF RUNOFF
|
28
|
|
3.7 FLOOD INVESTIGATIONS
|
28
,
29
|
|
3.8 SEDIMENTATION STUDIES
|
29
,
30
|
|
3.9 RAINFALL PATTERN AT WABO
|
30
|
|
3.10 TAILWATER RATING CURVE
|
31
|
|
3.11 WATER QUALITY
|
31
|
|
3.12 EVAPORATION
|
31
|
|
3.13 AURE RIVER AT SUPU
|
31
|
|
3.14 FURTHER INVESTIGATION
|
31
|
|
4. GEOLOGY 4.1 EXPLORATION OF WABO POWER PROJECT
|
33
|
|
4.2 GENERAL GEOLOGY
|
33
,
34
|
|
4.3 SEISMICITY
|
35
|
|
4.4 ENGINEERING GEOLOGICAL ASSESSMENTS OF WABO POWER PROJECT
|
35
,
36
,
37
,
38
,
39
,
40
|
|
4.5 GEOLOGY OF AURE PROJECT
|
40
,
41
,
42
|
|
5. CONSTRUCTION MATERIALS 5.1 GENERAL
|
43
,
44
|
|
5.2 REQUIRED QUANTITIES
|
44
|
|
5.3 SOURCES OF CONSTRUCTION MATERIALS
|
44
,
45
|
|
5.4 PROPERTIES OF THE CONSTRUCTION MATERIALS
|
46
,
47
,
48
|
|
5.5 ASSESSMENT OF MATERIALS AND FURTHER INVESTIGATIONS
|
48
,
49
|
|
6. OPTIMUM DEVELOPMENT 6.1 GENERAL
|
51
|
|
6.2 WABO INFLOWS
|
52
|
|
6.3 ENERGY OUTPUT FROM WABO
|
52
,
53
|
|
6.4 LOAD GROWTH AND OPTIMUM DEVELOPMENT
|
54
,
55
,
56
|
|
6.5 WABO POWER INSTALLATION
|
56
,
57
,
58
,
59
,
60
|
|
6.6 FIRMING OF WABO ENERGY
|
60
,
61
,
62
,
63
,
64
,
65
,
66
,
67
,
68
,
69
,
70
,
71
,
72
|
|
6.7 AURE HYDROELECTRIC SCHEME AS AN INITIAL DEVELOPMENT
|
72
,
73
,
74
,
75
,
76
|
|
6.8 OTHER HYDRO PROJECTS
|
77
,
78
|
|
7. PROJECT DESIGN 7.1 PRELIMINARY CONSIDERATIONS
|
79
,
80
,
81
,
82
,
83
,
84
,
85
,
86
,
87
|
|
No title
|
87
,
88
,
89
,
90
,
91
,
92
,
93
|
|
7.3 RIVER DIVERSION
|
93
,
94
,
95
,
96
,
97
,
98
,
99
,
100
,
101
,
102
,
103
|
|
7.4 DAM EMBANKMENTS
|
103
,
104
,
105
,
106
,
107
,
108
,
109
,
110
,
111
,
112
,
113
,
114
,
115
,
116
,
117
,
118
,
119
,
120
,
121
,
122
|
|
7.5 SPILLWAY
|
122
,
123
,
124
,
125
,
126
,
127
,
128
,
129
,
130
,
131
,
132
|
|
7.6 INTAKE AND PENSTOCK
|
132
,
133
,
134
,
135
,
136
,
137
,
138
,
139
,
140
,
141
,
142
,
143
,
144
,
145
|
|
7.7. POWER STATION
|
145
,
146
,
147
,
148
,
149
,
150
,
151
,
152
,
153
,
154
,
155
,
156
,
157
,
158
,
159
,
160
,
161
,
162
,
163
|
|
7.8 ENVIRONMENTAL FEATURES
|
163
,
164
,
165
,
166
,
167
,
168
|
|
8.1 GENERAL
|
169
|
|
8.2 ROUTE selection
|
169
,
170
,
171
,
172
|
|
8.3 DESIGN PRINCIPLES
|
172
,
173
,
174
|
|
No title
|
174
,
175
,
176
,
177
,
178
,
179
,
180
,
181
|
|
No title
|
181
,
182
,
183
,
184
|
|
No title
|
184
,
185
|
|
8.7 ACCESS ROAD DESIGN AND COSTS.
|
186
|
|
9. CONSTRUCTION PLANNING AND COST ESTIMATES 9.1 GENERAL
|
187
,
188
|
|
9.2 CONSTRUCTION PLANNING AND CONTRACTS
|
188
,
189
,
190
,
191
|
|
9.3 TRANSPORTATION
|
191
,
192
,
193
|
|
9.4 CONSTRUCTION FACILITIES AT WABO
|
194
,
195
,
196
,
197
,
198
|
|
9.5 CONSTRUCTION FACILITIES ELSEWHERE
|
198
|
|
No title
|
199
,
200
|
|
9.7 CONSTRUCTION METHODS AND EQUIPMENT
|
200
,
201
,
202
,
203
,
204
,
205
,
206
,
207
,
208
,
209
,
210
,
211
,
212
,
213
,
214
,
215
,
216
,
217
,
218
,
219
,
220
|
|
9.8 COST ESTIMATES
|
221
,
222
,
223
,
224
,
225
|
|
9.9 PROJECT FINANCE REQUIREMENTS
|
226
|
|
10. FINANCIAL AND ECONOMIC FEASIBILITY 10.1 GENERAL
|
227
|
|
10.2 LOAD GROWTH REQUIREMENTS
|
227
,
228
|
|
10.3 FINANCIAL REQUIREMENTS
|
228
,
229
|
|
10.4 COST RECOVERY
|
230
|
|
10.5 FINANCIAL POWER COST
|
230
,
231
|
|
10.6 1976 REAL BREAKEVEN COST
|
231
,
232
,
233
|
|
10.7 FUTURE ANNUAL BREAKEVEN COST ASSUMING INFLATION
|
233
,
234
,
235
|
|
10.8 REAL FINANCIAL RATE OF RETURN
|
235
,
236
|
|
10.9 PRICING POLICY TO INDUSTRY
|
237
|
|
10.10 ECONOMIC ANALYSIS
|
238
|
|
10.11 AN INITIAL HYDROELECTRIC DEVELOPMENT – AURE RIVER
|
238
,
239
|
|
11. ENVIRONMENTAL STUDIES 11.1 INTRODUCTION
|
241
,
242
,
243
|
|
11.2 FISHERIES
|
243
,
244
,
245
,
246
|
|
11.3 TERRESTRIAL AND AQUATIC BIOTA
|
246
,
247
,
248
|
|
11.4 DELTA ECOLOGY AND SEDIMENTATION
|
248
,
249
|
|
11.5 WATER QUALITY
|
250
|
|
11.6 WATERSHED MANAGEMENT
|
250
,
251
|
|
11.7 WAN SETTLEMENTS AND RELATED ISSUES
|
251
,
252
,
253
,
254
|
|
12. PROJECT IMPLEMENTATION 12.1 ORGANISATION REQUIRED
|
255
|
|
12.2 FINAL INVESTIGATION AND DESIGN
|
255
,
256
|
|
No title
|
256
|
|
13. REFERENCES
|
257
,
258
,
259
,
260
,
261
,
262
,
263
,
265
,
267
,
269
,
271
,
273
,
275
,
277
,
279
,
281
,
283
,
285
,
287
,
289
,
291
,
293
,
295
,
297
,
299
,
301
,
303
,
305
,
307
,
309
,
311
,
313
,
315
,
317
,
319
,
321
,
323
,
325
,
327
,
329
,
331
,
333
,
335
,
337
,
339
,
341
|
|
No title
|
343
,
345
,
346
,
347
,
348
,
349
,
350
,
351
,
353
|
|
No title
|
355
|
|
No title
|
357
,
358
,
359
,
361
|
|
No title
|
363
,
364
,
365
,
366
,
367
,
369
,
371
,
372
,
373
,
374
,
375
,
376
,
377
,
378
,
379
|
|
No title
|
381
,
382
,
383
,
384
|
|
No title
|
385
,
386
,
387
,
388
,
389
,
390
,
391
|
|
No title
|
393
,
394
,
395
,
396
|
|
No title
|
397
,
399
,
400
,
401
,
402
,
403
,
404
,
405
|
|
No title
|
407
,
408
,
409
,
410
,
411
,
412
,
413
,
414
|
|
No title
|
415
,
416
,
417
|
|
No title
|
418
,
419
,
420
,
421
|
|
No title
|
422
,
423
,
424
,
425
,
426
|
|
No title
|
427
,
429
,
430
,
431
,
432
|
|
No title
|
433
,
435
,
436
|
|
No title
|
437
,
438
,
439
,
440
,
441
,
442
,
443
,
444
,
445
|
|
No title
|
447
,
448
,
449
,
450
,
451
,
452
,
453
,
454
,
455
|
|
APPENDIX E-4 POWER STATION PLANT COST ESTIMATES
|
457
|
|
No title
|
459
|
|
APPENDIX E-6 ESTIMATED COST OF CONSTRUCTION FACILITIES
|
461
|
|
APPENDIX F FINANCIAL AND ECONOMIC FEASIBILITY
|
463
,
465
,
466
,
467
,
468
,
469
,
470
,
471
,
472
,
473
,
474
,
475
,
476
|
|
No title
|
477
,
478
,
479
,
480
,
481
,
482
,
483
,
484
,
485
,
486
,
487
|
|
No title
|
489
,
490
,
491
,
492
|
|
No title
|
493
,
495
,
496
,
497
,
498
,
499
,
500
,
501
,
502
,
503
|
|
No title
|
505
,
507
,
508
,
509
,
510
,
511
,
512
,
513
,
514
,
515
,
516
,
517
,
518
,
519
,
520
,
521
,
522
,
523
,
524
,
525
,
526
|