Purari River Wabo power project feasibility report: volume 2: hydroelectric project.

Holding Library Call Number
L016553
Holding Library
H.V. Evatt Library
Notes
ANBD No.: 2513056 - v. 1. Summary -- v. 2. Hydroelectric project -- v. 3. Port, industrial, and urban development -- v. 4. Access road -- v. 5. Geology and construction materials for hydroelectric plant -- v. 6. Hydrologic investigations for hydroelectric project -- v. 7. Field data for port, industrial, and urban development -- v. 8. Drill logs for hydroelectric project.

Contents

No title 1
No title 3 , 4 , 5
CONTENTS 7 , 8 , 9 , 10
LIST OF TABLES 11 , 12
LIST OF FIGURES 13 , 14
LIST OF APPENDIXES 14
1. INTRODUCTION 1.1 HISTORY OF INVESTIGATIONS 15
1.2 SCOPE OF REPORT 16
1.3 FIELD INVESTIGATIONS 16 , 17
1.4 GLOSSARY 17
2. PROJECT REQUIREMENTS AND MAJOR FEATURES 2.1 PROJECT REQUIREMENTS 19
2.2 WABO DAM AND ASSOCIATED WORKS 19 , 20 , 21 , 22
2.3 POWER TRANSMISSION 22
2.4 AUXILIARY POWER SOURCES 22 , 23
3. HYDROLOGIC INVESTIGATIONS 3.1 GENERAL 25
3.2 THE CATCHMENT 25
3.3 DATA AVAILABLE 25 , 26
3.4 ADDITIONAL DATA COLLECTED 26
3.5 RUNOFF ESTIMATION 27
3.6 GENERATED 500-YEAR SEQUENCE OF RUNOFF 28
3.7 FLOOD INVESTIGATIONS 28 , 29
3.8 SEDIMENTATION STUDIES 29 , 30
3.9 RAINFALL PATTERN AT WABO 30
3.10 TAILWATER RATING CURVE 31
3.11 WATER QUALITY 31
3.12 EVAPORATION 31
3.13 AURE RIVER AT SUPU 31
3.14 FURTHER INVESTIGATION 31
4. GEOLOGY 4.1 EXPLORATION OF WABO POWER PROJECT 33
4.2 GENERAL GEOLOGY 33 , 34
4.3 SEISMICITY 35
4.4 ENGINEERING GEOLOGICAL ASSESSMENTS OF WABO POWER PROJECT 35 , 36 , 37 , 38 , 39 , 40
4.5 GEOLOGY OF AURE PROJECT 40 , 41 , 42
5. CONSTRUCTION MATERIALS 5.1 GENERAL 43 , 44
5.2 REQUIRED QUANTITIES 44
5.3 SOURCES OF CONSTRUCTION MATERIALS 44 , 45
5.4 PROPERTIES OF THE CONSTRUCTION MATERIALS 46 , 47 , 48
5.5 ASSESSMENT OF MATERIALS AND FURTHER INVESTIGATIONS 48 , 49
6. OPTIMUM DEVELOPMENT 6.1 GENERAL 51
6.2 WABO INFLOWS 52
6.3 ENERGY OUTPUT FROM WABO 52 , 53
6.4 LOAD GROWTH AND OPTIMUM DEVELOPMENT 54 , 55 , 56
6.5 WABO POWER INSTALLATION 56 , 57 , 58 , 59 , 60
6.6 FIRMING OF WABO ENERGY 60 , 61 , 62 , 63 , 64 , 65 , 66 , 67 , 68 , 69 , 70 , 71 , 72
6.7 AURE HYDROELECTRIC SCHEME AS AN INITIAL DEVELOPMENT 72 , 73 , 74 , 75 , 76
6.8 OTHER HYDRO PROJECTS 77 , 78
7. PROJECT DESIGN 7.1 PRELIMINARY CONSIDERATIONS 79 , 80 , 81 , 82 , 83 , 84 , 85 , 86 , 87
No title 87 , 88 , 89 , 90 , 91 , 92 , 93
7.3 RIVER DIVERSION 93 , 94 , 95 , 96 , 97 , 98 , 99 , 100 , 101 , 102 , 103
7.4 DAM EMBANKMENTS 103 , 104 , 105 , 106 , 107 , 108 , 109 , 110 , 111 , 112 , 113 , 114 , 115 , 116 , 117 , 118 , 119 , 120 , 121 , 122
7.5 SPILLWAY 122 , 123 , 124 , 125 , 126 , 127 , 128 , 129 , 130 , 131 , 132
7.6 INTAKE AND PENSTOCK 132 , 133 , 134 , 135 , 136 , 137 , 138 , 139 , 140 , 141 , 142 , 143 , 144 , 145
7.7. POWER STATION 145 , 146 , 147 , 148 , 149 , 150 , 151 , 152 , 153 , 154 , 155 , 156 , 157 , 158 , 159 , 160 , 161 , 162 , 163
7.8 ENVIRONMENTAL FEATURES 163 , 164 , 165 , 166 , 167 , 168
8.1 GENERAL 169
8.2 ROUTE selection 169 , 170 , 171 , 172
8.3 DESIGN PRINCIPLES 172 , 173 , 174
No title 174 , 175 , 176 , 177 , 178 , 179 , 180 , 181
No title 181 , 182 , 183 , 184
No title 184 , 185
8.7 ACCESS ROAD DESIGN AND COSTS. 186
9. CONSTRUCTION PLANNING AND COST ESTIMATES 9.1 GENERAL 187 , 188
9.2 CONSTRUCTION PLANNING AND CONTRACTS 188 , 189 , 190 , 191
9.3 TRANSPORTATION 191 , 192 , 193
9.4 CONSTRUCTION FACILITIES AT WABO 194 , 195 , 196 , 197 , 198
9.5 CONSTRUCTION FACILITIES ELSEWHERE 198
No title 199 , 200
9.7 CONSTRUCTION METHODS AND EQUIPMENT 200 , 201 , 202 , 203 , 204 , 205 , 206 , 207 , 208 , 209 , 210 , 211 , 212 , 213 , 214 , 215 , 216 , 217 , 218 , 219 , 220
9.8 COST ESTIMATES 221 , 222 , 223 , 224 , 225
9.9 PROJECT FINANCE REQUIREMENTS 226
10. FINANCIAL AND ECONOMIC FEASIBILITY 10.1 GENERAL 227
10.2 LOAD GROWTH REQUIREMENTS 227 , 228
10.3 FINANCIAL REQUIREMENTS 228 , 229
10.4 COST RECOVERY 230
10.5 FINANCIAL POWER COST 230 , 231
10.6 1976 REAL BREAKEVEN COST 231 , 232 , 233
10.7 FUTURE ANNUAL BREAKEVEN COST ASSUMING INFLATION 233 , 234 , 235
10.8 REAL FINANCIAL RATE OF RETURN 235 , 236
10.9 PRICING POLICY TO INDUSTRY 237
10.10 ECONOMIC ANALYSIS 238
10.11 AN INITIAL HYDROELECTRIC DEVELOPMENT – AURE RIVER 238 , 239
11. ENVIRONMENTAL STUDIES 11.1 INTRODUCTION 241 , 242 , 243
11.2 FISHERIES 243 , 244 , 245 , 246
11.3 TERRESTRIAL AND AQUATIC BIOTA 246 , 247 , 248
11.4 DELTA ECOLOGY AND SEDIMENTATION 248 , 249
11.5 WATER QUALITY 250
11.6 WATERSHED MANAGEMENT 250 , 251
11.7 WAN SETTLEMENTS AND RELATED ISSUES 251 , 252 , 253 , 254
12. PROJECT IMPLEMENTATION 12.1 ORGANISATION REQUIRED 255
12.2 FINAL INVESTIGATION AND DESIGN 255 , 256
No title 256
13. REFERENCES 257 , 258 , 259 , 260 , 261 , 262 , 263 , 265 , 267 , 269 , 271 , 273 , 275 , 277 , 279 , 281 , 283 , 285 , 287 , 289 , 291 , 293 , 295 , 297 , 299 , 301 , 303 , 305 , 307 , 309 , 311 , 313 , 315 , 317 , 319 , 321 , 323 , 325 , 327 , 329 , 331 , 333 , 335 , 337 , 339 , 341
No title 343 , 345 , 346 , 347 , 348 , 349 , 350 , 351 , 353
No title 355
No title 357 , 358 , 359 , 361
No title 363 , 364 , 365 , 366 , 367 , 369 , 371 , 372 , 373 , 374 , 375 , 376 , 377 , 378 , 379
No title 381 , 382 , 383 , 384
No title 385 , 386 , 387 , 388 , 389 , 390 , 391
No title 393 , 394 , 395 , 396
No title 397 , 399 , 400 , 401 , 402 , 403 , 404 , 405
No title 407 , 408 , 409 , 410 , 411 , 412 , 413 , 414
No title 415 , 416 , 417
No title 418 , 419 , 420 , 421
No title 422 , 423 , 424 , 425 , 426
No title 427 , 429 , 430 , 431 , 432
No title 433 , 435 , 436
No title 437 , 438 , 439 , 440 , 441 , 442 , 443 , 444 , 445
No title 447 , 448 , 449 , 450 , 451 , 452 , 453 , 454 , 455
APPENDIX E-4 POWER STATION PLANT COST ESTIMATES 457
No title 459
APPENDIX E-6 ESTIMATED COST OF CONSTRUCTION FACILITIES 461
APPENDIX F FINANCIAL AND ECONOMIC FEASIBILITY 463 , 465 , 466 , 467 , 468 , 469 , 470 , 471 , 472 , 473 , 474 , 475 , 476
No title 477 , 478 , 479 , 480 , 481 , 482 , 483 , 484 , 485 , 486 , 487
No title 489 , 490 , 491 , 492
No title 493 , 495 , 496 , 497 , 498 , 499 , 500 , 501 , 502 , 503
No title 505 , 507 , 508 , 509 , 510 , 511 , 512 , 513 , 514 , 515 , 516 , 517 , 518 , 519 , 520 , 521 , 522 , 523 , 524 , 525 , 526

Text

Cite

Citation options:
Work identifier

http://nla.gov.au/nla.obj-4189370991

Download

Select the images you want to download, or the whole document.

Available formats
TIF high resolution
Include
All
Current

Or select a range of images:

Order

You can order a copy of this work from Copies Direct.

Copies Direct supplies reproductions of collection material for a fee. This service is offered by the National Library of Australia

Include

Or select a range of images:

Share

Share on Twitter

Share on Facebook

What can I do with this?

Unknown

Copyright status could not be determined due to data in the record being incomplete or inaccurate.

For more information please see: how copyright status is determined.