Purari River Wabo power project feasibility report: volume 3: port, industrial and urban development.

Holding Library Call Number
L016554
Holding Library
H.V. Evatt Library
Notes
ANBD No.: 2513056 - v. 1. Summary -- v. 2. Hydroelectric project -- v. 3. Port, industrial, and urban development -- v. 4. Access road -- v. 5. Geology and construction materials for hydroelectric plant -- v. 6. Hydrologic investigations for hydroelectric project -- v. 7. Field data for port, industrial, and urban development -- v. 8. Drill logs for hydroelectric project.

Contents

PURARI RIVER WABO POWER PROJECT FEASIBILITY REPORT 1
PURARI RIVER WABO POWER PROJECT FEASIBILITY REPORT 3 , 4 , 5
CONTENTS 7 , 8
LIST OF TABLES 9 , 10
LIST OF FIGURES 11 , 12
LIST OF APPENDIXES 13
1. INTRODUCTION AND SCOPE 1.1 INTRODUCTION 15
1.2 SCOPE 15 , 16
1.3 GLOSSARY 16
2. PLANNING CONSIDERATIONS 2.1 THE CHOICE OF PORT LOCATIONS 17
2.2 PRINCIPAL FEATURES OF THE GULF AND HALL SOUND 17 , 18 , 19
2.3 THE NATURE OF THE DEVELOPMENT 20 , 21 , 22 , 23
2.4 ALTERNATIVE DEVELOPMENTS IN THE GULF 23 , 24 , 25
2.5 DEVELOPMENT AT HALL SOUND 25
2.6 VAILALA AND HALL SOUND COMPARED 25 , 26 , 27 , 28 , 29 , 30 , 31
2.7 STAGED DEVELOPMENT – ALUMINIUM ONLY INITIALLY 31
2.8 RESTRICTED ALUMINIUM DEVELOPMENT 32 , 33
3. INDUSTRIAL REQUIREMENTS 3.1 GENERAL 35
3.2 MIX AND DEVELOPMENT STAGING 35 , 36 , 37
3.3 WATER 37
3.4 WASTE DISPOSAL 38 , 39 , 40
3.5 DRAINAGE 40 , 41
3.6 LAND AREAS FOR PROCESS PLANTS 41
3.7 LAND AREAS FOR STOCKPILES 42 , 43
4. PORT DEVELOPMENT 4.1 INTRODUCTION 45 , 46
4.2 RAM MATERIAL IMPORTS 46 , 47
4.3 EXPORTS 47
4.4 CARGO HANDLING AND COMMODITY CHARACTERISTICS 48 , 49 , 50 , 51 , 52
4.5 VESSEL CHARACTERISTICS 53
4.6 NUMBER OF BERTHS REQUIRED 53 , 54 , 55 , 56 , 57 , 59 , 60 , 61 , 62
4.7 LENGTHS OF BERTHS 62 , 63 , 65 , 66 , 67 , 68
4.8 WATER DEPTHS 68
4.9 CHANNEL AND BASINS 68 , 69
4.10 VESSEL HANDLING 69
4.11 STRUCTURAL REQUIREMENTS 69
4.12 COSTS 70 , 71 , 72
5. URBAN DEVELOPMENT 5.1 OBJECTIVES AND STANDARDS 73 , 74 , 75 , 76 , 77 , 78 , 79 , 80 , 81
5.2 POPULATION 82 , 83 , 84 , 85 , 87 , 89 , 90
5.3 COSTS 91 , 92 , 93 , 94 , 95 , 96 , 97 , 99 , 101 , 103
6. THE GULF ALTERNATIVES 6. EXISTING CONDITIONS 105 , 106 , 107 , 108 , 109 , 110 , 111 , 112 , 113 , 114 , 115 , 116 , 117 , 118 , 119 , 120 , 121 , 122 , 123 , 124
6.2 ALTERNATIVE SCHEMES EXAMINED 124 , 125 , 126 , 127 , 128 , 129 , 130 , 131 , 132 , 133 , 134 , 135 , 136 , 137 , 138 , 139 , 140
6.3 THE VAILALA DEVELOPMENT 140 , 141 , 142 , 143 , 144 , 145 , 146 , 147 , 148
7. HALL SOUND 7.1 EXISTING CONDITIONS 149 , 150 , 151 , 152 , 153 , 154 , 155
7.2 THE HALL SOUND DEVELOPMENT 155 , 156 , 157 , 158 , 159 , 160 , 161 , 162 , 163 , 164
8. LAND REQUIREMENTS 165 , 166 , 167
9. COST RECOVERY 9.1 GENERAL 169
9.2 ALTERNATIVE PORT LOCATIONS AND POWER DEMAND GROWTH 169
9.3 METHOD OF ANALYSIS 169 , 170 , 171
9.4 THE PORT 171 , 172 , 173
9.5 THE INDUSTRIAL ESTATE 173
9.6 URBAN DEVELOPMENT 174 , 175
10. RECOMMENDATIONS FOR FURTHER WORK 10.1 POLICIES AND LEGISLATION 177
10.2 ONGOING DATA COLLECTION 178
10.3 INVESTIGATIONS FOR FINAL DESIGN 178 , 179
11. REFERENCES 181 , 182 , 183 , 185 , 187 , 189 , 191 , 193 , 195 , 197 , 199 , 201 , 203 , 205 , 207 , 209 , 211 , 213 , 215 , 217 , 219 , 221 , 223 , 225 , 227 , 229 , 231 , 233 , 235 , 237 , 239 , 241 , 243 , 245 , 247 , 249 , 251 , 253 , 255 , 257 , 259 , 261 , 263
APPENDIX A 265
APPENDIX A-1 PORT COST ESTIMATES – VAILALA ONSHORE 267 , 268 , 269 , 270
APPENDIX A-2 PORT COST ESTIMATES – VAILALA OFFSHORE 271 , 272 , 273 , 274
APPENDIX A-3 PORT COST ESTIMATES – OROKCLO ONSHORE 275 , 276 , 277 , 278
APPENDIX A-4 PORT COST ESTIMATES – THE BLUFF OFFSHORE 279 , 280 , 281 , 282
APPENDIX A-5 PORT COST ESTIMATES – VAILALA PARTIALLY PROTECTED OFFSHORE 283 , 284
APPENDIX A-6 PORT COST ESTIMATES – HALL SOUND 285 , 286 , 287 , 289
APPENDIX A-8 PORT COST ESTIMATES – HALL SOUND 291 , 292
APPENDIX A-9 PORT COST ESTIMATES – HALL SOUND 293 , 294
APPENDIX A-10 PORT COST ESTIMATES – VAILALA 295 , 296
APPENDIX A-ll PORT COST ESTIMATES – VAILALA 297 , 298
APPENDIX A-12 INDUSTRY – ONSHORE SITE PREPARATION COSTS (ALUMINIUM ONLY) 299
APPENDIX A-13 INDUSTRY – ONSHORE SITE PREPARATION COSTS (ALUMINIUM ONLY) 300
APPENDIX B QUEUEING TIME VERSUS SERVICE TIME 301 , 303 , 304
APPENDIX C TOWN PLANNING DATA AND LAND DEVELOPMENT COSTS 305
APPENDIX C-1 LIST OF RETAIL AND COMMERCIAL ESTABLISHMENTS 307 , 308
APPENDIX C-2 LAND DEVELOPMENT COSTS 309 , 310 , 311 , 312 , 313
APPENDIX C-3. – INDUSTRY WORKFORCE AND PUBLIC SECTOR HOUSING 315
APPENDIX C-4 TELECOMMUNICATION COST ESTIMATES 317
APPENDIX C-5 GOVERNMENT OF PAPUA NEW GUINEA DEPARTMENT OF TRANSPORT WORKS AND SUPPLY AERODROME BRANCH 319 , 320 , 321 , 322 , 323 , 324 , 325
APPENDIX C-6 URBAN LAND REQUIREMENTS 5-YEAR POWER DEMAND GROWTH 327
APPENDIX C-7 URBAN LAND REQUIREMENTS 10-YEAR POWER DEMAND GROWTH 329
APPENDIX C-8 HOUSING FOR PUBLIC SECTOR EMPLOYEES 5—YEAR POWER DEMAND GROWTH 331
APPENDIX C-9 HOUSING FOR PUBLIC SECTOR EMPLOYEES 10—YEAR POWER DEMAND GROWTH 331
APPENDIX C-10 HOUSING FOR INDUSTRIAL WORKFORCE 5-YEAR POWER DEMAND GROWTH 333
APPENDIX C-11 HOUSING FOR INDUSTRIAL WORKFORCE 10—YEAR POWER DEMAND GROWTH 335
APPENDIX C-12 TOTAL NUMBER OF HOUSES REQUIRED 5—YEAR POWER DEMAND GROWTH 337
10—YEAR POWER DEMAND GROWTH 339
APPENDIX D SOCIAL DATA 341
APPENDIX D-1 POPULATION AND LAND USE IN THE GULF AREA 343 , 344 , 345 , 346 , 347 , 348
APPENDIX D-2 GULF AREA POPULATION 349 , 350
APPENDIX D-3 351
APPENDIX E SEDIMENTATION 353 , 355 , 357
APPENDIX F WIND AND WAVE ANALYSIS 359 , 361 , 362 , 363 , 365 , 366 , 367 , 369 , 371 , 373 , 374 , 375 , 377 , 379 , 381 , 383 , 385 , 386 , 387 , 389 , 391 , 393 , 395 , 396 , 397 , 399 , 401 , 403 , 404 , 405 , 407 , 409 , 411 , 413 , 415
APPENDIX G 417
APPENDIX G-1 COST RECOVERY ESTIMATES 419 , 420 , 421 , 423 , 424 , 425 , 426 , 427 , 428 , 429 , 430 , 431 , 432 , 433 , 434 , 435 , 436 , 437 , 438 , 439 , 440 , 441 , 442 , 443 , 444 , 445 , 446 , 447 , 448 , 449 , 450
APPENDIX G-2 DEVELOPMENT AND OPERATION 451 , 452 , 453
APPENDIX H RESTRICTED ALUMINIUM DEVELOPMENT 455 , 457 , 458 , 459 , 460 , 461 , 462 , 463 , 464 , 465 , 466 , 467 , 468 , 469 , 470 , 471 , 472 , 473 , 474 , 475 , 476 , 477 , 478 , 479 , 480 , 481 , 482 , 483 , 485 , 487 , 489 , 491 , 493 , 495 , 497 , 499 , 501 , 503
APPENDIX I GLOSSARY OF TERMS AND ABBREVIATIONS 505 , 507 , 508 , 509 , 510 , 511 , 512 , 513 , 514 , 515 , 517

Text

Cite

Citation options:
Work identifier

http://nla.gov.au/nla.obj-4189372052

Download

Select the images you want to download, or the whole document.

Available formats
TIF high resolution
Include
All
Current

Or select a range of images:

Order

You can order a copy of this work from Copies Direct.

Copies Direct supplies reproductions of collection material for a fee. This service is offered by the National Library of Australia

Include

Or select a range of images:

Share

Share on Twitter

Share on Facebook

What can I do with this?

Unknown

Copyright status could not be determined due to data in the record being incomplete or inaccurate.

For more information please see: how copyright status is determined.