Purari River Wabo power project feasibility report: volume 4: access road.

Holding Library Call Number
L016555
Holding Library
H.V. Evatt Library
Notes
ANBD No.: 2513056 - v. 1. Summary -- v. 2. Hydroelectric project -- v. 3. Port, industrial, and urban development -- v. 4. Access road -- v. 5. Geology and construction materials for hydroelectric plant -- v. 6. Hydrologic investigations for hydroelectric project -- v. 7. Field data for port, industrial, and urban development -- v. 8. Drill logs for hydroelectric project.

Contents

PURARI RIVER WABO POWER PROJECT FEASIBILITY REPORT 1
PURARI RIVER WABO POWER PROJECT FEASIBILITY REPORT 3 , 4
CONTENTS 5 , 6
LIST OF TABLES 6
LIST OF FIGURES 7
LIST OF APPENDIXES 8
PRINCIPAL CONCLUSIONS A. ALTERNATIVE ROUTE STUDIES 9 , 10
B. FIELD INVESTIGATIONS FOR ROUTE A + C 10
C. DESIGN AND COST ESTIMATES FOR ROUTE A + C 11
D. CONSTRUCTION PLANNING AND TIMES 11
E. MODIFIED ROUTE B 11
1. INTRODUCTION 13
2. ACCESS ROAD DESIGN STANDARDS 15
2.1 WABD TO IHU 15
2.2 AURE CONNECTION 16 , 17
3. ALTERNATIVE ROUTE STUDIES 3.1 GENERAL 19
3.2 GUIDELINES AND OPTIONS 19 , 20 , 21 , 22 , 23
3.3 DEVELOPMENT OF ALTERNATIVE ROUTES 24 , 25 , 26
3.4 ROUTE EVALUATION 27 , 28 , 29 , 30 , 31
4. FIELD INVESTIGATIONS 4.1 GENERAL 33
4.2 PRELIMINARY GEOLOGICAL INVESTIGATION 33 , 34
4.3 RIVER CROSS-SECTION SURVEY AT PROPOSED BRIDGE SITES 34
4.4 SOURCES OF CONCRETE AGGREGATE AND BASE-COURSE MATERIAL 34
5. DESIGN OF ACCESS ROADS ON ROUTE A + C 5.1 GENERAL 35
5.2 ALIGNMENT STUDY 35 , 36
5.3 PAVEMENT DESIGN 36 , 37
5.4 DRAINAGE DESIGN 37 , 38
5.5 BRIDGE DESIGN 38 , 39 , 40
6. CONSTRUCTION PLANNING AND COST ESTIMATES 6.1 GENERAL 41
6.2 CONSTRUCTION TIDIES 41 , 42
6.3 CONSTRUCTION METHODS 42 , 43
6.4 COST ESTIMATES 43 , 44
7. MODIFIED ROUTE B 7.1 GENERAL 45
7.2 ALIGNMENT STUDIES 45
7.3 COST ESTIMATES 45
8. REFERENCES 47 , 49 , 51 , 53 , 55 , 57 , 59 , 61 , 63 , 65 , 67 , 69 , 71 , 73 , 75 , 77 , 79 , 81 , 83 , 85 , 87 , 89 , 91 , 93 , 95 , 97 , 99 , 101 , 103 , 105 , 107 , 109 , 111 , 113 , 115 , 117 , 119 , 121 , 123 , 125 , 127 , 129 , 131 , 133 , 135 , 137 , 139 , 141 , 143 , 145 , 147 , 149 , 151 , 153 , 155 , 157 , 159 , 161 , 163 , 165 , 167 , 169 , 171 , 173 , 175 , 177 , 179 , 181 , 183 , 185 , 187 , 189 , 191 , 193 , 195 , 197 , 199 , 201 , 203 , 205 , 207 , 209 , 211 , 213 , 215 , 217 , 219 , 221 , 223 , 225 , 227 , 229 , 231 , 233
APPENDIX A TOPOGRAPHIC SURVEY AND MAPPING 235 , 237 , 238 , 239 , 240 , 241 , 243 , 245
APPENDIX B PAPUA NEW GUINEA DEPARTMENT OF TRANSPORT ENGINEERING DESIGN STANDARDS FOR RURAL ROADS 247 , 249
APPENDIX C COST ESTIMATES FOR ALTERNATIVE ROUTES 251 , 253 , 254 , 255 , 256
APPENDIX D DETAILS OF PAVEMENT DESIGN 257 , 259 , 260 , 261 , 262
APPENDIX E DETAILS OF DRAINAGE DESIGN 263 , 265 , 267 , 269 , 271 , 273 , 275
APPENDIX F LOADING CONDITIONS OF BRIDGE DESIGN 277 , 279 , 280 , 281
APPENDIX G EARTHWORK PLANNING 283 , 285 , 287 , 289
APPENDIX H MATERIAL LIST 291 , 293
No title 295 , 297 , 299 , 301 , 303 , 305 , 307 , 309 , 311 , 313 , 315 , 317
APPENDIX J COST ESTIMATES FOR MODIFIED ROUTE B 319 , 321

Text

Cite

Citation options:
Work identifier

http://nla.gov.au/nla.obj-4189373118

Download

Select the images you want to download, or the whole document.

Available formats
TIF high resolution
Include
All
Current

Or select a range of images:

Order

You can order a copy of this work from Copies Direct.

Copies Direct supplies reproductions of collection material for a fee. This service is offered by the National Library of Australia

Include

Or select a range of images:

Share

Share on Twitter

Share on Facebook

What can I do with this?

Unknown

Copyright status could not be determined due to data in the record being incomplete or inaccurate.

For more information please see: how copyright status is determined.